How To Fix PPH_DD129 - Horizon in past for Product &1 Plant &2 MRP Area &3 cannot be negative


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 129

  • Message text: Horizon in past for Product &1 Plant &2 MRP Area &3 cannot be negative

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD129 - Horizon in past for Product &1 Plant &2 MRP Area &3 cannot be negative ?

    The SAP error message PPH_DD129 indicates that there is an issue with the planning horizon for a specific product in a given plant and MRP area. The error message states that the planning horizon cannot be negative, which typically means that the system is trying to process a planning period that is set in the past.

    Cause:

    1. Negative Planning Horizon: The planning horizon for the product in the specified plant and MRP area is set to a date that is earlier than the current date.
    2. Configuration Issues: There may be incorrect settings in the MRP (Material Requirements Planning) configuration for the product or plant.
    3. Data Entry Errors: Incorrect data entry during the setup of the product or MRP area could lead to this error.
    4. Master Data Issues: The master data for the product, plant, or MRP area may not be correctly maintained, leading to inconsistencies.

    Solution:

    1. Check Planning Horizon Settings:

      • Go to the MRP area settings for the product and check the planning horizon configuration. Ensure that it is set to a future date.
      • You can find this in the material master under the MRP views.
    2. Adjust MRP Area Settings:

      • If the MRP area is incorrectly configured, adjust the settings to ensure that the planning horizon is valid and does not extend into the past.
    3. Review Master Data:

      • Check the master data for the product, plant, and MRP area to ensure that all relevant fields are correctly filled out and that there are no inconsistencies.
    4. Run MRP Again:

      • After making the necessary adjustments, run the MRP process again to see if the error persists.
    5. Consult Documentation:

      • Review SAP documentation or help resources for any specific guidelines related to the configuration of MRP areas and planning horizons.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like MM02 (Change Material), MD02 (Single-Item, Multi-Level MRP), or MD04 (Stock/Requirements List) to check and modify the relevant settings.
    • MRP Configuration: Familiarize yourself with MRP configuration settings in SAP, as they can vary based on the version and specific implementation of SAP.
    • User Roles: Ensure that you have the necessary permissions to make changes to the MRP settings and master data.

    By following these steps, you should be able to resolve the PPH_DD129 error and ensure that your planning horizon is correctly set.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant