Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix PPH_DD127 - Enter a number as horizon for Product &1 Plant &2 MRP Area &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 127

  • Message text: Enter a number as horizon for Product &1 Plant &2 MRP Area &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD127 - Enter a number as horizon for Product &1 Plant &2 MRP Area &3 ?

    The SAP error message PPH_DD127 typically occurs in the context of Material Requirements Planning (MRP) when a user is trying to enter a value for the planning horizon in a specific product, plant, and MRP area. The error indicates that the system expects a numeric value for the planning horizon, but the input provided is either missing or not a valid number.

    Cause:

    1. Invalid Input: The user may have entered a non-numeric value (e.g., letters, special characters) instead of a numeric value for the planning horizon.
    2. Empty Field: The field for the planning horizon may be left empty, which is not acceptable as the system requires a numeric input.
    3. Configuration Issues: There may be issues with the configuration of the MRP area or product settings that are causing the system to reject the input.

    Solution:

    1. Check Input: Ensure that you are entering a valid numeric value in the planning horizon field. The value should be a whole number representing the number of periods (days, weeks, etc.) for which planning is to be done.
    2. Field Validation: Make sure that the field is not left empty. If it is required, provide a valid number.
    3. Review Configuration: If the input is correct and the error persists, review the configuration settings for the product, plant, and MRP area to ensure they are set up correctly. This may involve checking the MRP settings in the material master or the relevant configuration in the SAP system.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific details on the planning horizon and its requirements in your version of SAP.
    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • MRP Area: An MRP area is a subdivision of a plant that allows for more detailed planning and control of materials. Each MRP area can have its own planning parameters.
    • Material Master: The material master record contains all the information about a material that is required to manage it in the system. Ensure that the material master data is complete and accurate.
    • Planning Horizon: The planning horizon defines the time frame for which the MRP calculations are performed. It is crucial for effective inventory management and production planning.

    By following these steps, you should be able to resolve the error and successfully enter the planning horizon for the specified product, plant, and MRP area.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author