How To Fix PPH_DD126 - Horizon in future for Product &1 Plant &2 MRP Area &3 cannot be zero


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 126

  • Message text: Horizon in future for Product &1 Plant &2 MRP Area &3 cannot be zero

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD126 - Horizon in future for Product &1 Plant &2 MRP Area &3 cannot be zero ?

    The SAP error message PPH_DD126 indicates that there is an issue with the planning horizon for a specific product in a given plant and MRP area. This error typically arises when the planning horizon is set to a future date, but the system is unable to process it because the relevant settings or data are not configured correctly.

    Cause:

    1. Planning Horizon Configuration: The planning horizon for the product in the specified plant and MRP area may not be set correctly. This could mean that the planning horizon is either not defined or is set to zero.
    2. Material Master Data: The material master data for the product may be incomplete or incorrect, particularly in the MRP views.
    3. MRP Area Settings: The MRP area settings may not be properly configured, leading to issues in planning.
    4. Time Period Settings: The time period settings in the MRP configuration may not allow for planning beyond a certain date.

    Solution:

    1. Check Planning Horizon:

      • Go to the MRP area settings and verify the planning horizon. Ensure that it is set to a valid future date and not zero.
      • You can check this in the transaction code MM02 (Change Material) and navigate to the MRP views.
    2. Review Material Master Data:

      • Ensure that all necessary fields in the material master are filled out correctly, especially in the MRP views.
      • Check if the material is marked for planning and that the relevant MRP type is set.
    3. MRP Area Configuration:

      • Review the configuration of the MRP area in transaction code OMIZ (Define MRP Areas) to ensure that it is set up correctly for the product and plant.
    4. Adjust Time Period Settings:

      • Check the configuration for the planning time fence and other related settings in the MRP configuration (transaction code OPP1 for planning parameters).
      • Ensure that the system allows planning for the desired time frame.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on configuring MRP areas and planning horizons.
    6. Testing:

      • After making the necessary changes, run a test planning run to ensure that the error does not reoccur.

    Related Information:

    • Transaction Codes:
      • MM02 - Change Material Master
      • OMIZ - Define MRP Areas
      • OPP1 - MRP Parameters
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • User Forums: Consider visiting SAP community forums or support channels for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to resolve the PPH_DD126 error and ensure that the planning horizon is correctly set for the specified product, plant, and MRP area.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author