Do you have any question about this error?
Message type: E = Error
Message class: PPESTRUCT - Messages for Structure Operations
Message number: 063
Message text: Warning: Large structure with &1 nodes and &2 variants is being copied
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPESTRUCT063
- Warning: Large structure with &1 nodes and &2 variants is being copied ?The SAP error message PPESTRUCT063 is a warning that indicates that a large structure is being copied, which contains a significant number of nodes and variants. This warning is typically encountered in the context of SAP's Production Planning and Detailed Scheduling (PP/DS) or similar modules where complex data structures are used.
Cause:
The warning is triggered when the system detects that the structure being copied has:
The warning serves as a caution that the operation may take a considerable amount of time or resources due to the size of the structure being processed. It does not necessarily indicate an error, but rather a potential performance issue.
Review the Structure: Analyze the structure being copied to determine if it is indeed necessary to copy such a large structure. If possible, consider simplifying the structure or reducing the number of nodes and variants.
Optimize Data: If the structure is too large, you may want to optimize the data by:
Increase System Resources: If the large structure is necessary, ensure that your SAP system has adequate resources (CPU, memory) to handle the operation efficiently.
Batch Processing: If applicable, consider breaking down the operation into smaller batches to avoid performance issues.
Consult Documentation: Refer to SAP documentation or notes related to the specific module you are working with for any additional recommendations or best practices.
Monitor Performance: After implementing changes, monitor the system's performance to ensure that the warning does not lead to significant slowdowns or issues.
This warning is primarily informational, and while it may not require immediate action, it is essential to be aware of the potential impact on system performance.
Get instant SAP help. Start your 7-day free trial now.
PPESTRUCT062
Structure is completely exploded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESTRUCT061
Maximum &1 characters allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESTRUCT064
Specify a change number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESTRUCT065
&1 &2 not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.