Message type: E = Error
Message class: PPESTRUCT - Messages for Structure Operations
Message number: 062
Message text: Structure is completely exploded
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPESTRUCT062
- Structure is completely exploded ?The SAP error message PPESTRUCT062: Structure is completely exploded typically occurs in the context of Production Planning and Execution (PP/PE) when dealing with the explosion of a bill of materials (BOM) or a production order. This error indicates that the system has attempted to explode a BOM or a production structure, but it has reached a point where all components have been fully exploded, and there are no further components to process. Causes: Complete Explosion: The BOM has been fully exploded, meaning all components have been accounted for, and there are no additional sub-components to process. Incorrect BOM Structure: The BOM may be incorrectly structured, leading to an unexpected explosion behavior. Circular References: There may be circular references in the BOM, causing the system to reach a limit in the explosion process.
Configuration Issues: There may be issues with the configuration of the material master or BOM settings. Solutions: Check BOM Structure: Review the BOM structure to
Get instant SAP help. Sign up for our Free Essentials Plan.
PPESTRUCT061
Maximum &1 characters allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESTRUCT060
The variant name cannot be longer than 8 characters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESTRUCT063
Warning: Large structure with &1 nodes and &2 variants is being copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESTRUCT064
Specify a change number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.