    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK316 - No line resources are assigned to line &1 ?

    The SAP error message PPECHK316 indicates that there are no line resources assigned to a specific production line (denoted by &1). This error typically occurs in the context of production planning and execution, particularly when working with production lines in the SAP system.

    Cause:

    The error can arise due to several reasons:

    1. Missing Resource Assignment: The production line has not been assigned any resources (e.g., machines, work centers) in the system.
    2. Incorrect Configuration: The configuration of the production line may be incomplete or incorrect, leading to the absence of assigned resources.
    3. Master Data Issues: There may be issues with the master data related to the production line or the resources that should be assigned to it.
    4. Planning Scenario: The planning scenario may not have been set up correctly, leading to the system not recognizing available resources.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Resource Assignment:

      • Navigate to the production line configuration in the SAP system.
      • Verify that the necessary resources (work centers, machines) are assigned to the production line.
    2. Assign Resources:

      • If resources are missing, you can assign them through the relevant transaction (e.g., using transaction codes like CR01 for creating work centers or CR02 for changing them).
      • Ensure that the resources are active and properly configured.
    3. Review Master Data:

      • Check the master data for both the production line and the resources to ensure that all necessary information is complete and accurate.
      • Make sure that the resources are available and not marked as inactive.
    4. Check Planning Parameters:

      • Review the planning parameters and settings to ensure that they are correctly configured for the production line.
      • Ensure that the planning scenario is appropriate for the production line in question.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on configuring production lines and resources.
    6. Testing:

      • After making the necessary changes, test the configuration by attempting to execute the production planning or scheduling process again to see if the error persists.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CR01, CR02, CR03 (for work centers), and PPC1 (for production line configuration).
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • User Roles: Ensure that you have the necessary authorizations to make changes to production line configurations and resource assignments.

    By following these steps, you should be able to identify and resolve the cause of the PPECHK316 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant