Message text: Action point &1 at line network &2 cannot be assigned to a line resource
The action point &V1& at the start and end of line network &V2& cannot
be assigned to a line resource because the line structure starts and
ends either with parallel or alternative lines. In order for the Action
Handler to determine the line resource assigned to
an action point, there must be distinct
starting and ending lines.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Ensure that the line structure has distinct starting and ending lines,
or,
maintain action points at each starting and ending line, as required.
Error message extract from SAP system. Copyright SAP SE.
PPECHK314
- Action point &1 at line network &2 cannot be assigned to a line resource ?The SAP error message PPECHK314 indicates that there is an issue with assigning an action point to a line resource in the context of production planning or process order management. This error typically arises in the SAP Production Planning (PP) or SAP Advanced Planning and Optimization (APO) modules.
Cause:
The error message PPECHK314 can be triggered by several factors, including:
- Resource Availability: The line resource may not be available for the specified action point due to scheduling conflicts or maintenance activities.
- Incorrect Configuration: The configuration of the line resource or action point may not be set up correctly in the system.
- Capacity Constraints: The line resource may have capacity constraints that prevent it from being assigned to the action point.
- Action Point Definition: The action point itself may not be defined correctly or may not be compatible with the line resource.
- Network Structure: There may be issues with the network structure or the way the action points are linked to the resources.
Solution:
To resolve the PPECHK314 error, you can take the following steps:
Check Resource Availability: Verify that the line resource is available for the time period in question. Check for any maintenance or other activities that may be blocking the resource.
Review Configuration: Ensure that the line resource and action point are configured correctly in the system. This includes checking the master data for both the resource and the action point.
Analyze Capacity: Check the capacity settings for the line resource. Make sure that it has enough capacity to handle the action point being assigned.
Validate Action Point: Ensure that the action point is defined correctly and is compatible with the line resource. Check for any restrictions or conditions that may apply.
Inspect Network Structure: Review the network structure to ensure that the action points are correctly linked to the line resources. Make any necessary adjustments to the network.
Consult Documentation: Refer to SAP documentation or help resources for additional guidance on the specific error message and its implications.
Testing: After making changes, test the assignment again to ensure that the error has been resolved.
Related Information:
C223
(Change Work Center) or C201
(Create Production Order) to help troubleshoot the issue.If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPECHK313
Production rate of line resource &1 at &2 &3 is not maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK312
Rep. pt. &1 at &2 at end of alt. work center &3 backfl. no comp./work ctr
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK315
The model &2 of &1 is not assigned to the APO resource &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK316
No line resources are assigned to line &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.