How To Fix PPECHK203 - &1 &2 has not been assigned to an activity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPECHK - iPPE Consistency Check

  • Message number: 203

  • Message text: &1 &2 has not been assigned to an activity

  • Show details Hide details
  • What causes this issue?

    Components that are not assigned to a routing activity are automatically
    assigned to the first production activity or the first line activity.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Check if the missing assignment of &V1& &V2& is included.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPECHK203 - &1 &2 has not been assigned to an activity ?

    The SAP error message PPECHK203 indicates that a specific component or resource (identified by &1 &2) has not been assigned to an activity in the context of production planning or project management. This error typically arises in scenarios involving production orders, project systems, or when working with capacity planning.

    Cause:

    1. Missing Assignment: The component or resource has not been assigned to the relevant activity or operation in the routing or production order.
    2. Incorrect Configuration: There may be an issue with the configuration of the routing or the production order itself.
    3. Data Inconsistency: There could be inconsistencies in the master data, such as the material master or the bill of materials (BOM).
    4. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or assign the component/resource.

    Solution:

    1. Check Assignments:

      • Go to the routing or production order where the error occurred.
      • Verify that the component/resource is correctly assigned to the relevant activity or operation.
      • If it is missing, add the component/resource to the activity.
    2. Review Master Data:

      • Check the material master and BOM to ensure that the component/resource is correctly defined and available.
      • Ensure that the routing is correctly set up and that all necessary components are included.
    3. Adjust Configuration:

      • If the routing or production order configuration is incorrect, make the necessary adjustments to ensure that all components/resources are properly assigned.
    4. Check Authorizations:

      • Ensure that the user has the necessary authorizations to make changes to the routing or production order.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the error message and related processes.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CO01 (Create Production Order), CO02 (Change Production Order), or C202 (Change Routing) to make the necessary adjustments.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to resolve the PPECHK203 error and ensure that all components and resources are properly assigned to the relevant activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author