Message type: E = Error
Message class: PPECHK - iPPE Consistency Check
Message number: 201
Message text: &1 &2 has no components assigned
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPECHK201
- &1 &2 has no components assigned ?The SAP error message PPECHK201 indicates that a particular production planning object (like a production order or a planned order) does not have any components assigned to it. This can occur in various contexts, such as when working with production orders, bill of materials (BOM), or routing.
Cause: Missing BOM: The production order or planned order may not have a Bill of Materials (BOM) assigned, which means there are no components defined for the production process. Incorrect Configuration: The configuration of the material or the production order may be incorrect, leading to the absence of components. Data Inconsistency: There may be inconsistencies in the master data, such as the material master or BOM not being properly maintained. Incorrect Order Type: The order type being used may not be set up to allow for components to be assigned.
Solution: Check BOM Assignment: Ensure that a valid BOM is assigned to the material in question. You can check this in
Get instant SAP help. Sign up for our Free Essentials Plan.
PPECHK200
************Messages for Process Structure Checks*********************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK199
Internal error: Check for &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPECHK202
&1 &2 has already been assigned to the activities &3 and &4
What causes this issue? Components cannot be assigned to multiple activities of a routing at the same time because different requirements for the sam...
PPECHK203
&1 &2 has not been assigned to an activity
What causes this issue? Components that are not assigned to a routing activity are automatically assigned to the first production activity or the fir...