Do you have any question about this error?
Message type: E = Error
Message class: PPEBAL - Line Balance Message
Message number: 423
Message text: &1 &2 was moved from &3 to &4
You want to assign a &V1& from line object &V3& to a different line
object.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Select a row with the &V1& below which you want to insert &V1&.
Error message extract from SAP system. Copyright SAP SE.
PPEBAL423
- &1 &2 was moved from &3 to &4 ?The SAP error message PPEBAL423 typically indicates that a particular object (like a production order, material, or resource) has been moved from one location or status to another within the system. This message is often related to the Production Planning (PP) module, particularly in the context of capacity planning or production scheduling.
Cause:
The error message PPEBAL423 can occur due to several reasons, including:
- Resource Allocation Changes: The resource or production order has been reassigned to a different work center or production line.
- Capacity Planning Adjustments: Changes in capacity planning or scheduling that affect the availability of resources.
- Material Availability Issues: The material required for production may have been moved or is no longer available in the expected location.
- Configuration Changes: Changes in the configuration of the production environment or master data that affect how resources are allocated.
Solution:
To resolve the PPEBAL423 error, consider the following steps:
- Check the Object Status: Verify the status of the object mentioned in the error message. Ensure that it is in the correct state for the operation you are trying to perform.
- Review Resource Allocation: Look into the resource allocation settings and ensure that the object is assigned to the correct work center or production line.
- Material Availability Check: Confirm that all required materials are available in the correct locations. If materials have been moved, update the system accordingly.
- Capacity Planning Review: Reassess the capacity planning settings to ensure they align with the current production requirements.
- Consult Change Logs: If applicable, check the change logs to see if any recent changes might have triggered the error.
- SAP Notes and Documentation: Look for any relevant SAP Notes or documentation that might provide additional insights or fixes related to this error.
Related Information:
By following these steps, you should be able to identify the root cause of the PPEBAL423 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
PPEBAL422
Select the new item &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL421
Select a &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL803
Entry &1 will be deleted when you save
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEBAL804
Entry &1 cannot be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.