How To Fix PPEBAL300 - ******************* Evaluations ****************************************


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 300

  • Message text: ******************* Evaluations ****************************************

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEBAL300 - ******************* Evaluations **************************************** ?

    The SAP error message PPEBAL300 typically relates to issues in the Production Planning and Detailed Scheduling (PP/DS) module, particularly concerning the evaluation of production balance or capacity planning. This error can arise during various processes, such as when trying to balance production orders or during the evaluation of production capacities.

    Cause:

    The error message PPEBAL300 can be triggered by several factors, including:

    1. Data Inconsistencies: There may be inconsistencies in the master data, such as material master records, production resources/tools (PRT), or work centers.
    2. Capacity Issues: The system may not have enough capacity to fulfill the planned production, leading to an imbalance.
    3. Incorrect Planning Parameters: The planning parameters set in the system may not align with the actual production capabilities or requirements.
    4. Missing or Incorrect Configuration: Configuration settings in the PP/DS module may be incorrect or incomplete, leading to evaluation failures.
    5. Locked Objects: Sometimes, objects may be locked due to ongoing processes, preventing the evaluation from completing successfully.

    Solution:

    To resolve the PPEBAL300 error, consider the following steps:

    1. Check Master Data: Verify that all relevant master data (materials, work centers, PRTs) is correctly maintained and consistent.
    2. Review Capacity Planning: Ensure that the capacity of work centers is sufficient to meet the production requirements. Adjust capacity settings if necessary.
    3. Adjust Planning Parameters: Review and adjust the planning parameters in the PP/DS settings to ensure they are appropriate for your production environment.
    4. Configuration Review: Check the configuration settings in the PP/DS module to ensure they are set up correctly. This may involve consulting with a functional consultant or SAP expert.
    5. Unlock Objects: If objects are locked, identify the processes that are causing the locks and resolve them. This may involve waiting for the processes to complete or manually unlocking the objects if appropriate.
    6. Run Evaluation Again: After making the necessary adjustments, rerun the evaluation process to see if the error persists.

    Related Information:

    • SAP Notes: Check SAP Notes related to PPEBAL300 for any specific patches or updates that may address known issues.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/SDP94 for planning board evaluations or /SAPAPO/MC90 for capacity planning.
    • Documentation: Review SAP documentation and guides related to PP/DS for best practices and troubleshooting tips.
    • Community Forums: Engage with SAP community forums or user groups for insights from other users who may have encountered similar issues.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author