How To Fix PPEACT633 - 'Continual res. load' in &1 from &2 to &3 only poss. in 'end-start' rel.


PPEACT633 - Overview

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 633

  • Message text: 'Continual res. load' in &1 from &2 to &3 only poss. in 'end-start' rel.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT633 - 'Continual res. load' in &1 from &2 to &3 only poss. in 'end-start' rel. ?
    The SAP error message PPEACT633, which states "Continual res. load in &1 from &2 to &3 only poss. in 'end-start' rel.," typically occurs in the context of production planning and scheduling. This error indicates that there is an issue with the scheduling of resources (like machines or work centers) in a production order or process.
    
    Cause: The error arises when there is an attempt to schedule a continual resource load (like a machine that needs to run continuously) in a way that does not conform to the required scheduling relationships. Specifically, it suggests that the scheduling is being attempted in a manner that is not compatible with the 'end-start' relationship, which is a common scheduling dependency where one task must finish before another can start.
    Solution: To resolve this error, consider the following steps: Check Scheduling Relationships: Review the scheduling relationships defined for the production order or process. Ensure that the tasks are set up

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant