Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 632
Message text: 'Continual res. load' in &1 from &2 to &3 only poss. in res-mode linkage
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEACT632
- 'Continual res. load' in &1 from &2 to &3 only poss. in res-mode linkage ?The SAP error message PPEACT632 'Continual res. load' typically occurs in the context of production planning and capacity planning when there is an issue with the resource allocation or scheduling of operations. This error indicates that a continual resource load is not possible in the specified resource mode linkage.
Cause: The error can arise due to several reasons: Resource Mode Linkage: The resource mode linkage is not set up correctly, or the resource is not configured to handle continual loads. Capacity Constraints: The resource may have capacity constraints that prevent it from being scheduled for continual operations. Scheduling Parameters: The scheduling parameters for the operation may not align with the resource's capabilities. Incorrect Configuration: There may be incorrect settings in the routing or work center that do not allow for continual processing.
Solution: To resolve the PPEACT632 error, consider the following steps: Check Resource Configuration: Go to the work center configuration and ensure that the resource is set up correctly
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEACT631
&1 between activities &2 and &3 is only valid below operations
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT630
There is an indirect &1 on operation-level for activities &2 and &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT633
'Continual res. load' in &1 from &2 to &3 only poss. in 'end-start' rel.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT634
Unit and minimum transition must be maintained in &1 from &2 to &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.