Do you have any question about this error?
Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 623
Message text: No iPPE routing is assigned to the access
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPEACT623
- No iPPE routing is assigned to the access ?The SAP error message PPEACT623 indicates that there is no iPPE (Integrated Product and Process Engineering) routing assigned to the access you are trying to use. This error typically occurs in the context of production planning and process engineering when the system cannot find the necessary routing information for a specific product or process.
Cause:
- Missing Routing Assignment: The most common cause is that the iPPE routing has not been assigned to the material or product you are trying to access.
- Incorrect Configuration: There may be an issue with the configuration of the iPPE settings in the system.
- Data Inconsistency: There could be inconsistencies in the master data related to the product or process.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the routing information.
Solution:
Check Routing Assignment:
- Go to the iPPE workbench and verify if the routing is correctly assigned to the material or product.
- If it is not assigned, you will need to create or assign the appropriate routing.
Create or Update Routing:
- If the routing does not exist, you may need to create a new iPPE routing for the product.
- If it exists but is not assigned, you can assign it through the iPPE workbench.
Verify Configuration:
- Check the configuration settings for iPPE in your SAP system to ensure everything is set up correctly.
- Ensure that the necessary settings for routing and access are properly configured.
Check Master Data:
- Review the master data for the product to ensure that all necessary information is complete and accurate.
- Look for any missing or incorrect entries that could lead to this error.
User Authorizations:
- Ensure that the user has the necessary authorizations to access the iPPE routing information.
- If needed, consult with your SAP security team to verify and adjust user roles and permissions.
Related Information:
C223
(Create iPPE Routing) or C224
(Change iPPE Routing) to manage routing assignments.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in iPPE.
Get instant SAP help. Start your 7-day free trial now.
PPEACT622
This version is not allowed in iPPE
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT621
The process structure &1 &2 &3 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT624
Assignment cannot be deleted because it is not assigned to an activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEACT625
The assigned activity &1 does not belong to the routing of assignmnt list
What causes this issue? The activity that you have just assigned does not belong to the routing that was selected in the assignment list.System Respo...
Click on this link to search all SAP messages.