How To Fix PPEACT512 - Unit and duration at &1 &2 must be maintained together


PPEACT512 - Overview

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 512

  • Message text: Unit and duration at &1 &2 must be maintained together

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT512 - Unit and duration at &1 &2 must be maintained together ?
    The SAP error message PPEACT512 indicates that there is an inconsistency in the data entry for a particular activity or process in the system. Specifically, it states that the "Unit" and "Duration" must be maintained together for a given activity. This error typically arises in the context of project planning or activity management within SAP, particularly in modules like Project System (PS) or Production Planning (PP).
    
    Cause: The error occurs when: You have entered a value for either the "Unit" or "Duration" but not for both. The system requires both fields to be filled out to ensure that the activity can be properly scheduled and managed.
    Solution: To resolve this error, you should: Check the Activity Details: Go to the activity or task where the error is occurring. Maintain Both Fields: Ensure that both the "Unit" (e.g., hours, days) and "Duration" (the actual time span for the activity) are filled in. If you have a duration specified, make

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker