Message type: E = Error
Message class: PPEACT - Messages for iPPE ACT Application (Activities)
Message number: 125
Message text: &1 &2 requires a reporting point that posts goods movements
The &v1& &v2& requires a reporting point that posts goods movement as
there is either an activity for which scrap has been maintained, or
an activity of type <LS>Production</> is assigned at the end of a
sequence.
If the routing is only used in planning and there is no backflush,
no reporting point has to be maintained.
Or
Maintain a reporting point at &V1& &V2& that can post goods movement and
assign a reporting point to each activity mode.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEACT125
- &1 &2 requires a reporting point that posts goods movements ?The SAP error message PPEACT125 indicates that a reporting point (which is typically a location or a point in the production process) requires a configuration that allows for the posting of goods movements. This error often arises in the context of Production Planning (PP) or Production Execution (PE) when trying to execute certain transactions or processes that involve goods movements, such as confirmations or production orders.
Cause: Missing Configuration: The reporting point is not configured to allow goods movements. This could be due to missing settings in the master data or configuration settings in the system. Incorrect Reporting Point: The reporting point being used may not be valid for the type of goods movement being attempted. Authorization Issues: The user may not have the necessary authorizations to perform goods movements at the specified reporting point.
Solution: Check Reporting Point Configuration: Go to the configuration settings for the reporting point in the SAP system. Ensure that the reporting point
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEACT124
Change numbers &1 and &2 at &3 &4 have the same "Valid from" date
What causes this issue? Different change statuses of a mode cannot have the same valid-from date as the mode can only have once active change status ...
PPEACT123
Setup act. with setup group below &1 &2 can only be located at beginning
What causes this issue? In an operation, only the first setup activity can be assigned a setup group and setup key. This setup activity must be the f...
PPEACT126
No primary resource has been specified at &1 &2
What causes this issue? You must specify resources for planning in APO. However, resources do not always have to be specified for SNP and CTM plannin...
PPEACT127
Specify a reporting point for each change status of &1 &2
What causes this issue? You have defined a reporting point type at the activity for mode &v2&. The activity is now relevant for backflush, an...
Click on this link to search all SAP messages.