How To Fix PPEACT108 - Scheduling data is incomplete for &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPEACT - Messages for iPPE ACT Application (Activities)

  • Message number: 108

  • Message text: Scheduling data is incomplete for &1 &2

  • Show details Hide details
  • What causes this issue?

    For an activity to be considered for planning in SAP APO, at least one
    standard time must be maintained at the activity mode.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Enter at least one standard time (with corresponding unit) at &V1& &V2&.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPEACT108 - Scheduling data is incomplete for &1 &2 ?

    The SAP error message PPEACT108 indicates that the scheduling data is incomplete for a specific production order or process order. This error typically arises in the context of production planning and execution, particularly when the system is unable to find all the necessary scheduling information to proceed with the operation.

    Cause

    The error can be caused by several factors, including:

    1. Missing Scheduling Data: The production order or process order may not have all the required scheduling data filled in, such as start and finish dates, or the necessary operations may not be defined.

    2. Incomplete Master Data: The master data for the materials, routing, or work centers may be incomplete or incorrectly configured, leading to missing scheduling information.

    3. Configuration Issues: There may be issues with the configuration of the production planning module, such as missing settings in the production version or planning strategy.

    4. Status of the Order: The order may be in a status that does not allow scheduling, such as being locked or not released.

    Solution

    To resolve the PPEACT108 error, you can take the following steps:

    1. Check the Order: Review the production or process order in question. Ensure that all necessary fields related to scheduling are filled out correctly. This includes checking the start and finish dates, operations, and any dependencies.

    2. Review Master Data:

      • Material Master: Ensure that the material master data is complete and correctly configured.
      • Routing: Check the routing for the order to ensure that all operations are defined and have the necessary scheduling information.
      • Work Center: Verify that the work center associated with the order is correctly set up and has the required capacity and scheduling data.
    3. Check Configuration: Review the configuration settings in the production planning module to ensure that everything is set up correctly. This may involve checking the production version, planning strategies, and other related settings.

    4. Order Status: Ensure that the order is in a status that allows for scheduling. If the order is not released, you may need to release it before scheduling can occur.

    5. Use Transaction Codes: Utilize relevant transaction codes such as:

      • CO02: Change Production Order
      • CO03: Display Production Order
      • C223: Check Routing
      • CR02: Change Work Center
    6. Consult Documentation: If the issue persists, consult SAP documentation or reach out to your SAP support team for further assistance.

    Related Information

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Transaction Logs: Review transaction logs for any additional error messages or warnings that may provide more context about the issue.
    • User Forums: Consider searching or posting in SAP community forums for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to identify and resolve the cause of the PPEACT108 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant