How To Fix PPC0066 - Order &1 already has status 'Final confirmation'


PPC0066 - Overview

  • Message type: E = Error

  • Message class: PPC0 - Messages for PP Confirmation

  • Message number: 066

  • Message text: Order &1 already has status 'Final confirmation'

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPC0066 - Details

  • The SAP error message PPC0066, which states "Order &1 already has status 'Final confirmation'," typically occurs in the context of production order processing within the SAP system. This error indicates that the production order you are trying to modify or confirm has already been finalized, meaning that no further changes or confirmations can be made to it.
    
    Cause: Final Confirmation: The production order has already been confirmed as complete, and SAP does not allow any further modifications or confirmations to an order that has reached this status. System Configuration: The system may be configured to prevent changes to finalized orders to maintain data integrity and accuracy in reporting. User Actions: A user may have inadvertently attempted to confirm the order again after it has already been finalized.
    Solution: Check Order Status: Verify the status of the production order in question. You can do this by navigating to the production order in the SAP system and checking

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPC0066 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant