How To Fix PP_SCH_PRODN032 - The overdue orders are resolved using &1 and scheduled after &2 days &3.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PP_SCH_PRODN -

  • Message number: 032

  • Message text: The overdue orders are resolved using &1 and scheduled after &2 days &3.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PP_SCH_PRODN032 - The overdue orders are resolved using &1 and scheduled after &2 days &3. ?

    The SAP error message PP_SCH_PRODN032 indicates that there are overdue production orders that have not been scheduled in a timely manner. The message typically provides information about the number of days the orders are overdue and the specific production orders affected.

    Cause:

    1. Overdue Production Orders: The primary cause of this error is that there are production orders that have not been scheduled for production within the expected timeframe. This can happen due to various reasons, such as:
      • Resource constraints (e.g., machine breakdowns, lack of materials).
      • Incorrect planning parameters or settings in the production planning module.
      • Changes in demand or production priorities that were not reflected in the scheduling.
      • Manual scheduling errors or oversight.

    Solution:

    To resolve this error, you can take the following steps:

    1. Review Overdue Orders: Identify the specific production orders that are overdue. You can do this by checking the production order list in the SAP system.

    2. Analyze Scheduling Parameters: Check the scheduling parameters and settings in the production planning module. Ensure that they are correctly configured to reflect the current production environment.

    3. Check Resource Availability: Verify the availability of resources (machines, labor, materials) required for the production orders. If there are constraints, address them by:

      • Allocating additional resources.
      • Rescheduling other orders to free up capacity.
      • Ensuring that materials are available for production.
    4. Adjust Production Schedule: If necessary, adjust the production schedule to prioritize the overdue orders. This may involve rescheduling other orders or changing production priorities.

    5. Use the Rescheduling Functionality: Utilize SAP's rescheduling functionality to automatically adjust the dates of the overdue orders based on the current production capacity and constraints.

    6. Communicate with Stakeholders: If the delays are due to changes in demand or priorities, communicate with relevant stakeholders (e.g., sales, supply chain) to align on the production schedule.

    Related Information:

    • Transaction Codes: You can use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to view and manage production orders.
    • Reports: Utilize reports such as COOIS (Production Order Information System) to get insights into production orders and their statuses.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to scheduling and production orders.
    • Training and Documentation: Ensure that users involved in production planning are trained on best practices for scheduling and managing production orders in SAP.

    By following these steps, you should be able to resolve the PP_SCH_PRODN032 error and improve the scheduling of production orders in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author