Do you have any question about this error?
Message type: E = Error
Message class: PP -
Message number: 247
Message text: Selected schedule too long, old values reset
When transferred to a time interval the schedule you have
selected / changed is too long for the validity period
of the business event type / location entered. The selection
/ change is therefore cancelled and replaced by the schedule set
previously.
Error message extract from SAP system. Copyright SAP SE.
PP247
- Selected schedule too long, old values reset ?The SAP error message PP247 ("Selected schedule too long, old values reset") typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the scheduling period you are trying to select is too long for the system to process, leading to the resetting of old values.
Cause:
- Excessive Time Frame: The selected scheduling period exceeds the limits set in the system configuration. This can happen if you are trying to schedule production orders or operations over an extended period that the system cannot handle.
- Configuration Settings: The settings in the production planning module may not be configured to allow for long scheduling periods.
- Data Volume: A large volume of data or a high number of operations within the selected period can also lead to this error.
Solution:
- Reduce the Scheduling Period: Try to select a shorter scheduling period. Break down the scheduling into smaller time frames that the system can handle.
- Check Configuration Settings: Review the configuration settings in the production planning module. You may need to adjust the parameters that define the maximum allowable scheduling period.
- Optimize Data: If the issue is related to data volume, consider optimizing the data being processed. This could involve archiving old data or simplifying the scheduling process.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to scheduling limits.
- System Performance: Ensure that the system performance is adequate. Sometimes, performance issues can exacerbate problems with scheduling.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can analyze the specific configuration and data in your system.
Get instant SAP help. Start your 7-day free trial now.
PP085
Position the cursor correctly
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP038
Compare standard authorization with RHAUTUPD_NEW - Note 1865692
What causes this issue? You are trying to use report RHPORFL0 to adjust the standard authorizations (rollout assignments).System Response You can co...
PP301
Input help was canceled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PP302
System error: possible entries not possible with mode &1
What causes this issue? The RH_OBJID_REQUEST function module was called using a value (&V1&) that is not allowed for the MODE parameter. This...
Click on this link to search all SAP messages.