How To Fix POWL029 - Shared Memory limit reached


POWL029 - Overview

  • Message type: E = Error

  • Message class: POWL - Internal Messages used in generic personal object work list

  • Message number: 029

  • Message text: Shared Memory limit reached

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message POWL029 - Shared Memory limit reached ?
    The SAP error message POWL029: Shared Memory limit reached typically occurs when the shared memory allocated for the Persistent Object Worklist (POWL) has been exceeded. This can happen due to various reasons, such as a large number of work items being processed or insufficient memory allocation for the POWL.
    
    Cause: Excessive Work Items: If there are too many work items in the POWL, it can exceed the allocated shared memory limit.
    Configuration Issues: The configuration settings for shared memory may not be optimized for the current workload. Memory Leaks: There may be memory leaks in the application that are causing the shared memory to fill up. System Resource Limitations: The overall system resources (RAM, CPU) may be constrained, leading to insufficient memory for POWL.
    Solution: Increase Shared Memory Allocation: You can increase the shared memory allocation for POWL by adjusting the parameters in the SAP system. This can typically be done in transaction RZ10 or RZ11. Look for parameters

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant