Do you have any question about this error?
Message type: E = Error
Message class: PN -
Message number: 882
Message text: Not able to calculate the start time for the job.
A job should be planned in the future.
It was not possible to calculate the start time and the start date for
that job. The Error number of the function Module END_TIME_DETERMINE is
&v2.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please refer to the errors of the function module END_TIME_DETERMINE
and contact your system administrator or your customizing team.
Error message extract from SAP system. Copyright SAP SE.
PN882
- Not able to calculate the start time for the job. ?The SAP error message PN882, which states "Not able to calculate the start time for the job," typically occurs in the context of job scheduling in SAP. This error can arise due to various reasons related to job scheduling, resource availability, or configuration issues. Here are some common causes, potential solutions, and related information:
Causes:
- Missing Job Parameters: The job may not have all the necessary parameters defined, such as the start time or frequency.
- Resource Conflicts: There may be conflicts with other scheduled jobs or resources that prevent the job from being scheduled.
- Calendar Issues: The job may be scheduled on a date or time that is not valid according to the defined calendar.
- System Load: High system load or resource constraints may prevent the job from being scheduled.
- Configuration Errors: Incorrect configuration in the job scheduling settings or in the background processing settings.
Solutions:
- Check Job Parameters: Review the job definition to ensure that all required parameters, including start time and frequency, are correctly set.
- Review Job Conflicts: Check for other jobs scheduled at the same time or that may conflict with the resources required by the job.
- Validate Calendar Settings: Ensure that the job is scheduled on valid dates and times according to the defined work calendar.
- Monitor System Load: Check the system performance and resource availability. If the system is under heavy load, consider rescheduling the job to a less busy time.
- Configuration Review: Review the background processing configuration in the SAP system to ensure that it is set up correctly.
- Check for Errors in Job Logs: Look at the job logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
SM37
(to monitor jobs) and SM36
(to define jobs) to manage and troubleshoot job scheduling.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PN881
Data from job & has been transferred successfully
What causes this issue? The data required from job &v1 has been transferred successfully to the lead system. The data is available in the lead sy...
PN880
Job & is 'ready to be executed'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PN890
Check the selection screen version in the report characteristics
What causes this issue? You want to replace a master data report class with a payroll report class (or vice versa). The system remembers that in such...
PN891
Inconsistency between report category and ACTIVE selection screen version
What causes this issue? A payroll report class (or a master data report class) is assigned to the report, although the selection screen version of th...
Click on this link to search all SAP messages.