Do you have any question about this error?
Message type: E = Error
Message class: PN -
Message number: 850
Message text: Scheduler was started for report & variant &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PN850
- Scheduler was started for report & variant & ?The SAP error message PN850 indicates that the scheduler has been started for a specific report and variant. This message is typically informational rather than an error, meaning it is not necessarily indicative of a problem but rather a notification that the scheduling process has been initiated.
Cause:
- Scheduler Activation: The message is triggered when a background job is scheduled to run a specific report with a defined variant.
- Job Management: It can occur when a user or system process initiates a job that is set to run at a specific time or under certain conditions.
Solution:
Since PN850 is an informational message, there is generally no action required unless you are experiencing issues with the scheduled job itself. However, if you are looking to manage or troubleshoot scheduled jobs, consider the following steps:
- Check Job Status: Use transaction code SM37 to monitor the status of the scheduled job. You can filter by job name, user, or date to find the specific job.
- Review Job Logs: If the job fails or does not produce the expected results, check the job logs for any error messages or warnings that can provide insight into what went wrong.
- Adjust Scheduling Parameters: If the job is not running as expected, you may need to adjust the scheduling parameters, such as the frequency, start time, or variant settings.
- Consult Documentation: Review SAP documentation or help resources for specific reports to understand their expected behavior and any prerequisites that may need to be met.
Related Information:
If you encounter further issues or specific errors related to the job, it may be helpful to consult with your SAP Basis team or refer to SAP support for more detailed troubleshooting.
Get instant SAP help. Start your 7-day free trial now.
PN809
Internal error: No entry in table PTAB on &1 for personnel number &2
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
PN808
Please choose an information message
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PN851
Job could not be scheduled. Reason: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PN852
Job successfully scheduled: & on &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.