How To Fix PMRP_TRANSFER026 - Material &1 &2 &3 cannot be considered for pMRP, if used as co-product


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PMRP_TRANSFER - Messages for PMRP_TRANSFER

  • Message number: 026

  • Message text: Material &1 &2 &3 cannot be considered for pMRP, if used as co-product

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMRP_TRANSFER026 - Material &1 &2 &3 cannot be considered for pMRP, if used as co-product ?

    The SAP error message PMRP_TRANSFER026 indicates that a specific material cannot be considered for the planning run in the context of the production planning process, particularly when it is being used as a co-product. This error typically arises in the context of Production Planning (PP) and Material Requirements Planning (MRP) when the system encounters issues with the configuration or status of the materials involved.

    Cause:

    1. Co-Product Configuration: The material in question is defined as a co-product in the production process, but it may not be properly configured in the system to be included in the planning run.
    2. Material Status: The material may have a status that prevents it from being included in MRP, such as being marked as "blocked" or "inactive."
    3. MRP Type: The MRP type assigned to the material may not be suitable for co-products, or it may not be set up to allow for planning in the context of co-products.
    4. Routing Issues: There may be issues with the routing or production version that prevent the material from being considered in the planning run.
    5. Master Data Issues: Incomplete or incorrect master data for the material, such as missing planning parameters or incorrect settings in the material master.

    Solution:

    1. Check Material Master: Review the material master data for the affected material. Ensure that the MRP type is appropriate and that the material is not blocked or inactive.
    2. Review Co-Product Settings: Verify the configuration of co-products in the production process. Ensure that the co-product is correctly defined in the routing and that it is set up to be included in MRP.
    3. Check Routing and Production Version: Ensure that the routing and production version are correctly set up and that they include the co-product in the planning process.
    4. Update MRP Parameters: If necessary, update the MRP parameters for the material to ensure it can be considered in the planning run.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring co-products and resolving related issues.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • Transaction Codes: Use transaction codes such as MM03 (Display Material), CO01 (Create Production Order), and MD04 (Stock/Requirements List) to investigate the material and its planning status.
    • MRP Configuration: Review the MRP configuration settings in the system to ensure that they align with the requirements for co-products.
    • User Exits and BAdIs: If custom logic is implemented, check for any user exits or BAdIs that may affect the planning behavior of co-products.

    By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant