Message type: E = Error
Message class: PMRP - Messages for pMRP
Message number: 056
Message text: Resource Overload Tolerance must be between 0 and 100
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMRP056
- Resource Overload Tolerance must be between 0 and 100 ?The SAP error message PMRP056 indicates that there is an issue with the "Resource Overload Tolerance" setting in the system. This error typically occurs when the value set for the resource overload tolerance is outside the acceptable range of 0 to 100.
Cause: The error is caused by one of the following: Invalid Value: The value entered for the resource overload tolerance is either less than 0 or greater than 100. Configuration Error: There may be a configuration issue in the system where the tolerance value has not been set correctly.
Solution: To resolve the PMRP056 error, follow these steps: Check the Value: Navigate to the relevant configuration or settings where the resource overload tolerance is defined. Ensure that the value is set between 0 and 100. If it is outside this range, adjust it to a valid value. Adjust Tolerance Settings: If you are using a specific transaction or module (like Project Management or Production Planning), go to the
Get instant SAP help. Sign up for our Free Essentials Plan.
PMRP055
No demand-driven material available or material without demand in &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP054
No Bucket list available for Reference ID &1 and Simulation ID &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP057
Durations cannot be negative
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMRP058
Not more than 2 years of difference between start &1 and end &2 allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...