Do you have any question about this error?
Message type: E = Error
Message class: PMMO_PEGGING - Messages for Pegging in PMMO
Message number: 215
Message text: Grouping setup error for WBS &1, plant &2 & MRP group &3
There is a grouping setup error for the WBS element &v1&, the plant &v2&
and the MRP group &v3&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Use the transaction <AB>GRM5 </>to create an entry.
Error message extract from SAP system. Copyright SAP SE.
PMMO_PEGGING215
- Grouping setup error for WBS &1, plant &2 & MRP group &3 ?The SAP error message PMMO_PEGGING215 indicates a "Grouping setup error" related to a Work Breakdown Structure (WBS) element, a plant, and a Material Requirements Planning (MRP) group. This error typically arises in the context of production planning and control, particularly when there are issues with the configuration or setup of the WBS elements in relation to the MRP settings.
Causes:
- Incorrect WBS Configuration: The WBS element may not be properly configured or may not exist in the system.
- Missing or Incorrect MRP Group: The MRP group assigned to the material may not be set up correctly or may not exist.
- Plant-Specific Settings: The plant specified may not have the necessary settings or may not be linked correctly to the WBS or MRP group.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the WBS, plant, or MRP group.
- Data Inconsistencies: There may be inconsistencies in the master data related to the WBS, plant, or MRP group.
Solutions:
- Check WBS Configuration: Verify that the WBS element exists and is correctly configured in the system. Ensure that it is active and properly linked to the project.
- Review MRP Group Settings: Check the MRP group assigned to the material. Ensure that it is correctly set up and that all necessary parameters are defined.
- Validate Plant Settings: Ensure that the plant specified in the error message is correctly set up in the system and that it is linked to the WBS and MRP group.
- Authorization Check: Ensure that the user has the necessary authorizations to access and modify the relevant WBS, plant, and MRP group settings.
- Data Consistency Check: Run consistency checks on the master data to identify and resolve any discrepancies that may exist.
Related Information:
CJ20N
(Project Builder) to check WBS elements, MM02
(Change Material) to review MRP group settings, and OMD1
(Define MRP Groups) to manage MRP group configurations.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and project systems.
Get instant SAP help. Start your 7-day free trial now.
PMMO_PEGGING212
Replenishment &1 stopped because MRP group not found for material
What causes this issue? The in-stock records cannot be processed for the purchase order or the production order. The system could not find an MRP gro...
PMMO_PEGGING211
Production order &1 stopped because MRP group not found for material
What causes this issue? The system stopped processing the production order because it did not find an MRP group for the material.System Response The...
PMMO_PEGGING261
Over assignment: Replen. &1 assigned/ordered &3 / &2 &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEGGING262
Adjusted total order quantity for replen. &1 from &2 to &3 &4
What causes this issue? The total quantity &V3& &V4& of a pegging assignment for the replenishment &V1& exceeds the total ord...
Click on this link to search all SAP messages.