Do you have any question about this error?
Message type: E = Error
Message class: PMMO_PEGGING - Messages for Pegging in PMMO
Message number: 101
Message text: Grouping WBS element &2 requires &1 to be included in the current run
The selected grouping &V2& has a related higher-level grouping &V1&.
However, &V1& is not included in the pegging run.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Include &V1& on the selection screen of the pegging report.
Error message extract from SAP system. Copyright SAP SE.
PMMO_PEGGING101
- Grouping WBS element &2 requires &1 to be included in the current run ?The SAP error message PMMO_PEGGING101 typically occurs in the context of production planning and materials management, particularly when dealing with pegging and the assignment of requirements to specific production orders or projects. This error indicates that a specific Work Breakdown Structure (WBS) element requires a certain component or material to be included in the current run for processing.
Cause:
The error is generally caused by one of the following reasons:
- Missing Component: The required component or material (indicated by &1) is not included in the current planning run for the specified WBS element (indicated by &2).
- Planning Configuration: There may be issues with the configuration of the planning parameters or settings that prevent the system from recognizing the required components.
- Data Inconsistencies: There could be inconsistencies in the master data, such as the WBS element not being properly linked to the required materials or components.
Solution:
To resolve the PMMO_PEGGING101 error, you can take the following steps:
Check Material Availability:
- Ensure that the required material/component (&1) is available in the system and is correctly defined in the material master.
Review WBS Element:
- Verify that the WBS element (&2) is correctly set up and that it has the necessary components assigned to it. Check the assignment of materials to the WBS element in the project structure.
Run Planning Again:
- If the required component was recently added or modified, try running the planning process again to see if the error persists.
Check Planning Parameters:
- Review the planning parameters and settings in the system to ensure they are configured correctly for the current run.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details related to the error message and its context.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CJ20N
(Project Builder) to check the WBS elements and their assignments or MD04
(Stock/Requirements List) to check the availability of materials.By following these steps, you should be able to identify the root cause of the PMMO_PEGGING101 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
PMMO_PEGGING044
Missing master data for underpegged WBS - grouping WBS &1, MRP area &2
What causes this issue? Missing master data for underpegged WBS element for account assignment group &V1& and MRP area &V2&.System Re...
PMMO_PEGGING043
Replenishment elem. &2 not pegged because no assignments found for NHA &1
What causes this issue? The replenishment element &v2& was not pegged because no assignments were found for the next higher assembly &v1&...
PMMO_PEGGING102
No valid material number was found for the selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEGGING103
In procurement: recursive assignment for replenishment element &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...