Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: PMMO_PEGGING - Messages for Pegging in PMMO
Message number: 037
Message text: Rework order &1 pegged to NHA replen &2 ahead of earlier replenishments
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMMO_PEGGING037
- Rework order &1 pegged to NHA replen &2 ahead of earlier replenishments ?The SAP error message PMMO_PEGGING037 indicates that there is a conflict in the pegging of a rework order to a non-hazardous material (NHA) replenishment. Specifically, it means that the rework order is pegged to a replenishment order that is scheduled to occur before earlier replenishments, which can lead to issues in the production planning and material availability.
Cause:
- Pegging Conflicts: The rework order is trying to use a replenishment that is scheduled to be processed before other replenishments that should logically occur first.
- Incorrect Order of Operations: The system may have been set up in a way that does not respect the chronological order of replenishments.
- Configuration Issues: There may be configuration settings in the SAP system that are not aligned with the business processes, leading to incorrect pegging.
Solution:
- Review Pegging Relationships: Check the pegging relationships in the system to ensure that the rework order is correctly pegged to the appropriate replenishments. You may need to adjust the pegging to align with the correct sequence of operations.
- Adjust Replenishment Orders: If necessary, modify the scheduling of the replenishment orders to ensure that they are processed in the correct order. This may involve rescheduling or re-prioritizing certain orders.
- Check Configuration Settings: Review the configuration settings related to production planning and material management to ensure they are set up correctly. This may involve consulting with a SAP configuration expert.
- Use Transaction Codes: Utilize transaction codes such as MD04 (Stock/Requirements List) or COHV (Mass Processing of Production Orders) to analyze and adjust the orders as needed.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling pegging issues and error messages.
Related Information:
By following these steps, you should be able to resolve the PMMO_PEGGING037 error and ensure that your rework orders are correctly pegged to the appropriate replenishments.
Get instant SAP help. Sign up for our Free Essentials Plan.
PMMO_PEGGING036
Pegging assignment already exists for WBS element &1
What causes this issue? The WBS element &V1& is used in PMMO assignment records (table PMMO_ASSIGNMENT, field PSPNR_ASSGND). Do not delete th...
PMMO_PEGGING035
Assignment not possible: missing master data &1, group &2, MRP area &3
What causes this issue? Pegging assignment is not possible because of missing master data: &V1&, grouping WBS element &V2&, MRP area ...
PMMO_PEGGING038
An error occured in parallel processing; the pegging run was terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEGGING039
Rework requirement &1 with date &2 is skipped for rework replenishment &3
What causes this issue? The system does not process the rework order requirements &V1& with date &V2& until all rework replenishment ...
Click on this link to search all SAP messages.