Do you have any question about this error?
Message type: E = Error
Message class: PMMO_PEGGING - Messages for Pegging in PMMO
Message number: 036
Message text: Pegging assignment already exists for WBS element &1
The WBS element &V1& is used in PMMO assignment records (table
PMMO_ASSIGNMENT, field PSPNR_ASSGND).
Do not delete this entry because this could lead to inconsistent data.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check your entries.
INCLUDE PMMO_MMI_CUSTOMIZABLE_MSG OBJECT DOKU ID TX LANGUAGE EN
Error message extract from SAP system. Copyright SAP SE.
PMMO_PEGGING036
- Pegging assignment already exists for WBS element &1 ?The SAP error message PMMO_PEGGING036 indicates that there is an attempt to create a pegging assignment for a Work Breakdown Structure (WBS) element that already has an existing pegging assignment. This typically occurs in the context of project management and production planning within SAP, where resources or materials are being allocated to specific tasks or projects.
Cause:
Existing Pegging Assignment: The primary cause of this error is that the WBS element you are trying to assign resources or materials to already has a pegging assignment. This could happen if:
- The assignment was made previously and not cleared.
- There are multiple users or processes trying to assign resources to the same WBS element simultaneously.
Data Integrity Issues: Sometimes, inconsistencies in the database or issues with data integrity can lead to this error.
Solution:
Check Existing Assignments:
- Use transaction codes like
CJ20N
(Project Builder) orCJI3
(Project Actual Line Items) to check if there are existing pegging assignments for the WBS element in question.- Review the assignments and determine if they are still valid or if they can be modified or removed.
Remove or Modify Existing Assignment:
- If the existing assignment is no longer needed, you can remove it. This can typically be done in the same transaction where you check the assignments.
- If the assignment needs to be modified, make the necessary changes to the existing assignment instead of creating a new one.
Consult Documentation: Review SAP documentation or help files related to pegging assignments and WBS elements for additional guidance.
Check for Concurrent Processes: Ensure that no other users or processes are trying to assign resources to the same WBS element at the same time, which could lead to conflicts.
Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance. They may provide insights specific to your system configuration or any known issues.
Related Information:
CJ20N
, CJI3
, and CJR2
for managing WBS elements and their assignments.By following these steps, you should be able to resolve the PMMO_PEGGING036 error and successfully manage your WBS assignments in SAP.
Get instant SAP help. Start your 7-day free trial now.
PMMO_PEGGING035
Assignment not possible: missing master data &1, group &2, MRP area &3
What causes this issue? Pegging assignment is not possible because of missing master data: &V1&, grouping WBS element &V2&, MRP area ...
PMMO_PEGGING034
Mandatory field "Exception Handling Category" (EXC_CAT) is not filled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEGGING037
Rework order &1 pegged to NHA replen &2 ahead of earlier replenishments
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEGGING038
An error occured in parallel processing; the pegging run was terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.