How To Fix PMMO_PEGDIS010 - Error in profit center &1 assigned to WBS &2


PMMO_PEGDIS010 - Overview

  • Message type: E = Error

  • Message class: PMMO_PEGDIS - Pegging & Distribution relevant Messages

  • Message number: 010

  • Message text: Error in profit center &1 assigned to WBS &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMMO_PEGDIS010 - Error in profit center &1 assigned to WBS &2 ?
    The SAP error message PMMO_PEGDIS010 indicates that there is an issue with the profit center assigned to a Work Breakdown Structure (WBS) element. This error typically arises in the context of project management and cost accounting within SAP, particularly when trying to post costs or perform transactions related to a WBS element.
    
    Cause: Profit Center Assignment: The profit center assigned to the WBS element may not be valid or may not exist in the system. WBS Element Configuration: The WBS element may not be properly configured to allow for the assignment of a profit center. Master Data Issues: There may be inconsistencies or missing data in the master data related to the profit center or WBS element. Authorization Issues: The user may not have the necessary authorizations to access or modify the profit center or WBS element.
    Solution: Check Profit Center: Verify that the profit center assigned to the WBS element exists and is active. You can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author