Do you have any question about this error?
Message type: E = Error
Message class: PMMO_PEG_BRKPT_MAINT - Messages about Pegging breakpoint maintenance
Message number: 001
Message text: Either a valid project or a valid requirement WBS is required
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMMO_PEG_BRKPT_MAINT001
- Either a valid project or a valid requirement WBS is required ?The SAP error message PMMO_PEG_BRKPT_MAINT001 indicates that a valid project or a valid Work Breakdown Structure (WBS) element is required for the operation you are trying to perform. This error typically occurs in the context of project management or when dealing with project-related data in SAP.
Cause:
Missing Project or WBS Element: The most common cause of this error is that the system cannot find a valid project or WBS element associated with the transaction you are trying to execute. This could be due to:
- The project or WBS element not being created or activated.
- The project or WBS element being incorrectly entered or referenced.
- The project or WBS element being deleted or archived.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the project or WBS element.
Configuration Issues: There may be configuration settings in the project management module that are not set up correctly.
Solution:
Check Project/WBS Element:
- Verify that the project or WBS element you are trying to use exists in the system.
- Ensure that it is active and not archived or deleted.
- Check the spelling and format of the project or WBS element ID you are entering.
Create or Activate Project/WBS:
- If the project or WBS element does not exist, create it using the appropriate transaction (e.g., CJ01 for creating a project).
- If it exists but is inactive, activate it.
Authorization Check:
- Ensure that you have the necessary authorizations to access the project or WBS element. You may need to contact your SAP security administrator to verify your access rights.
Consult Configuration:
- If you suspect a configuration issue, consult with your SAP project management module configuration team to ensure that all necessary settings are correctly configured.
Transaction Context:
- Make sure you are in the correct transaction context that requires a project or WBS element. Some transactions may not require these elements, while others do.
Related Information:
By following these steps, you should be able to resolve the error message PMMO_PEG_BRKPT_MAINT001 and proceed with your project management tasks in SAP.
Get instant SAP help. Start your 7-day free trial now.
PMMO_PEGGING262
Adjusted total order quantity for replen. &1 from &2 to &3 &4
What causes this issue? The total quantity &V3& &V4& of a pegging assignment for the replenishment &V1& exceeds the total ord...
PMMO_PEGGING261
Over assignment: Replen. &1 assigned/ordered &3 / &2 &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT002
Invalid material number (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_PEG_BRKPT_MAINT003
Invalid project ID (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.