Do you have any question about this error?
Message type: E = Error
Message class: PMMO_DISTRIBUTION - Messages for Distribution in PMMO
Message number: 006
Message text: Invalid period &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PMMO_DISTRIBUTION006
- Invalid period &1 ?The SAP error message PMMO_DISTRIBUTION006, which states "Invalid period &1," typically occurs in the context of the SAP Plant Maintenance (PM) module, particularly when dealing with maintenance planning and scheduling. This error indicates that the system is unable to process a request due to an invalid period specified in the operation or planning data.
Causes:
- Invalid Date Range: The specified period (e.g., start or end date) does not fall within the valid range defined in the system.
- Fiscal Year Variance: The period may not align with the fiscal year settings or the periods defined in the controlling area.
- Period Locking: The period may be locked for posting or changes, preventing any modifications or entries.
- Configuration Issues: There may be configuration issues in the planning settings or master data that lead to the invalid period error.
Solutions:
- Check Date Validity: Verify the dates being used in the transaction. Ensure that they fall within the valid range set in the system.
- Review Fiscal Year Settings: Check the fiscal year variant and ensure that the period you are trying to use is open for posting.
- Unlock Period: If the period is locked, you may need to unlock it or use a different period that is open for transactions.
- Adjust Planning Data: If the error arises from planning data, review the planning settings and ensure they are correctly configured.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the configuration of periods in your system.
Related Information:
IP01
(Create Maintenance Plan), IP02
(Change Maintenance Plan), or IP03
(Display Maintenance Plan) to check the maintenance plans and their periods.If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the PM module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PMMO_DISTRIBUTION005
Future posting date &1 is not allowed
What causes this issue? The posting date &V1& is not allowed.System Response Distribution processing is not possible.How to fix this error? ...
PMMO_DISTRIBUTION004
No valid grouping WBS element could be selected
What causes this issue? The combination of selection criteria for the grouping WBS elements and the replenishment objects did not match any valid WBS...
PMMO_DISTRIBUTION007
Invalid fiscal year &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PMMO_DISTRIBUTION008
Posting date &1 does not fall into period &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.