How To Fix PMMO_DISTRIBUTION002 - Distributed costs &1 to operative WBS element &2


PMMO_DISTRIBUTION002 - Overview

  • Message type: E = Error

  • Message class: PMMO_DISTRIBUTION - Messages for Distribution in PMMO

  • Message number: 002

  • Message text: Distributed costs &1 to operative WBS element &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PMMO_DISTRIBUTION002 - Distributed costs &1 to operative WBS element &2 ?
    The SAP error message PMMO_DISTRIBUTION002 typically occurs in the context of project management and cost distribution in SAP. This error indicates that there is an issue with distributing costs to an operative Work Breakdown Structure (WBS) element. Here’s a breakdown of the potential causes, solutions, and related information:
    Causes:
    
    Incorrect WBS Element: The WBS element specified may not be valid or may not exist in the system.
    Cost Distribution Settings: There may be issues with the configuration of cost distribution settings in the project system.
    Cost Center Assignment: The cost center associated with the WBS element may not be correctly assigned or may not exist.
    Status of WBS Element: The WBS element may be in a status that does not allow for cost distribution (e.g., it may be locked or closed).
    Missing Authorizations: The user may not have the necessary authorizations to perform cost distribution to the specified WBS element.
    
    Solutions:
    
    Verify WBS Element: Check if the WBS

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant