How To Fix /PMG/GE_ENH004 - BTS already scheduled; master policy &1 locked for mass change execution.


/PMG/GE_ENH004 - Overview

  • Message type: E = Error

  • Message class: /PMG/GE_ENH -

  • Message number: 004

  • Message text: BTS already scheduled; master policy &1 locked for mass change execution.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PMG/GE_ENH004 - Details

  • The SAP error message /PMG/GE_ENH004 BTS already scheduled; master policy &1 locked for mass change execution typically occurs in the context of SAP's Project Management or similar modules when there is an attempt to perform a mass change operation on a master policy that is already being processed or locked for changes.
    
    Cause: Concurrent Processing: The error indicates that a mass change operation is already in progress for the specified master policy (&1). This could happen if multiple users or processes are trying to modify the same policy simultaneously. Locking Mechanism: SAP uses a locking mechanism to prevent data inconsistencies. If a policy is locked for mass changes, other attempts to modify it will be blocked until the lock is released. Long-Running Processes: If a previous mass change operation is taking longer than expected, it may hold the lock longer than necessary.
    Solution: Check for Active Processes: Verify if there are any ongoing mass change processes

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PMG/GE_ENH004 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant