How To Fix /PMG/GE_COR055 - Scheduling is not successful. Please refer to log.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PMG/GE_COR -

  • Message number: 055

  • Message text: Scheduling is not successful. Please refer to log.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PMG/GE_COR055 - Scheduling is not successful. Please refer to log. ?

    The SAP error message /PMG/GE_COR055 Scheduling is not successful. Please refer to log. typically indicates that there was an issue during the scheduling process in the SAP system, particularly in the context of project management or resource management. This error can arise from various underlying causes, and the solution often depends on the specific details found in the log file referenced in the error message.

    Possible Causes:

    1. Resource Availability: The resources required for the scheduling may not be available or may be overbooked.
    2. Incorrect Data: There may be incorrect or incomplete data in the project or resource definitions.
    3. Configuration Issues: There could be configuration issues in the project management settings or resource management settings.
    4. System Performance: The system may be experiencing performance issues, leading to timeouts or failures in scheduling.
    5. Dependencies: There may be unresolved dependencies or constraints that prevent successful scheduling.
    6. Authorization Issues: The user may not have the necessary authorizations to perform the scheduling operation.

    Solutions:

    1. Check the Log: The first step is to check the log file mentioned in the error message. This log will provide detailed information about what went wrong during the scheduling process.
    2. Review Resource Allocation: Ensure that all resources required for the project are available and not over-allocated. Adjust resource assignments as necessary.
    3. Validate Data: Check the project and resource data for completeness and correctness. Ensure that all necessary fields are filled out and that there are no inconsistencies.
    4. Configuration Review: Review the configuration settings related to project management and scheduling. Ensure that they are set up correctly.
    5. System Performance: If the system is slow or unresponsive, consider checking system performance metrics and addressing any bottlenecks.
    6. Check Dependencies: Review any dependencies or constraints that may be affecting the scheduling process. Resolve any conflicts that may exist.
    7. Authorization Check: Ensure that the user has the necessary permissions to perform scheduling tasks. If not, work with your SAP security team to grant the required authorizations.

    Related Information:

    • SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • Documentation: Refer to the official SAP documentation for project management and scheduling to understand the expected configurations and processes.
    • Community Forums: Consider searching or posting in SAP community forums for insights from other users who may have encountered similar issues.

    By following these steps and investigating the log file, you should be able to identify the root cause of the error and implement an appropriate solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant