How To Fix /PM0/ALB_MESSAGES372 - Start/change date must be between effective date and next int. due date


/PM0/ALB_MESSAGES372 - Overview

  • Message type: E = Error

  • Message class: /PM0/ALB_MESSAGES -

  • Message number: 372

  • Message text: Start/change date must be between effective date and next int. due date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ALB_MESSAGES372 - Start/change date must be between effective date and next int. due date ?
    The SAP error message /PM0/ALB_MESSAGES372 indicates that there is an issue with the scheduling of a maintenance plan or task. Specifically, the error states that the start or change date you are trying to set must fall between the effective date and the next interval due date of the maintenance plan.
    
    Cause: Date Range Violation: The start or change date you are trying to enter is outside the valid range defined by the effective date and the next interval due date. Incorrect Maintenance Plan Configuration: The maintenance plan may not be set up correctly, or the dates may not have been updated after a change. System
    Configuration Issues: There may be issues with how the system is configured to handle maintenance plans and their scheduling.
    Solution: Check Dates: Verify the effective date and the next interval due date of the maintenance plan. Ensure that the start or change date you are trying to enter falls within

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author