Message type: E = Error
Message class: /PM0/ALB_FND_MSG -
Message number: 649
Message text: Reschedule distribution for &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ALB_FND_MSG649
- Reschedule distribution for &1 ?The SAP error message /PM0/ALB_FND_MSG649 typically indicates that there is an issue with the scheduling of a distribution process in the SAP system. This message is often related to the Advanced Planning and Optimization (APO) module or similar planning functionalities within SAP.
Cause: The error message usually arises due to one or more of the following reasons: Resource Constraints: There may be insufficient resources (e.g., capacity, materials) available to fulfill the distribution requirements. Incorrect Planning Parameters: The planning parameters or settings may not be correctly configured, leading to scheduling conflicts. Data Issues: There could be missing or incorrect data in the master data (e.g., product, location) or transaction data (e.g., orders, forecasts). Time Constraints: The time frame for the distribution may not be feasible, either due to lead times or other scheduling conflicts.
Solution: To resolve the error, you can take the following steps: Check Resource Availability: Ensure that the necessary resources (e.g., production capacity, transportation) are available for
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ALB_FND_MSG648
A conversion exists already on &1 for this fund/fund range
What causes this issue? A conversion exists already on &v1& for this combination of fund and fund range.System Response If a conversion exis...
/PM0/ALB_FND_MSG647
Fund status "inactive" or "obsolete" is invalid
What causes this issue? There is a scheduled fund conversion for this fund, but this has not yet been executed. If you set the fund status to <LS&...
/PM0/ALB_FND_MSG650
Reschedule conversion for &1
What causes this issue? The system has already included the processed fund conversion in in-force business.System Response The system issues an erro...
/PM0/ALB_FND_MSG651
Distribution has already been scheduled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.