How To Fix /PM0/ALB_FND_MSG649 - Reschedule distribution for &1


/PM0/ALB_FND_MSG649 - Overview

  • Message type: E = Error

  • Message class: /PM0/ALB_FND_MSG -

  • Message number: 649

  • Message text: Reschedule distribution for &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PM0/ALB_FND_MSG649 - Details

  • The SAP error message /PM0/ALB_FND_MSG649 typically indicates that there is an issue with the scheduling of a distribution process in the SAP system. This message is often related to the Advanced Planning and Optimization (APO) module or similar planning functionalities within SAP.
    
    Cause: The error message usually arises due to one or more of the following reasons: Resource Constraints: There may be insufficient resources (e.g., capacity, materials) available to fulfill the distribution requirements. Incorrect Planning Parameters: The planning parameters or settings may not be correctly configured, leading to scheduling conflicts. Data Issues: There could be missing or incorrect data in the master data (e.g., product, location) or transaction data (e.g., orders, forecasts). Time Constraints: The time frame for the distribution may not be feasible, either due to lead times or other scheduling conflicts.
    Solution: To resolve the error, you can take the following steps: Check Resource Availability: Ensure that the necessary resources (e.g., production capacity, transportation) are available for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PM0/ALB_FND_MSG649 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker