How To Fix /PM0/ABP_REPVAL_MSG034 - Settlement period must not exceed contract duration


/PM0/ABP_REPVAL_MSG034 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABP_REPVAL_MSG -

  • Message number: 034

  • Message text: Settlement period must not exceed contract duration

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABP_REPVAL_MSG034 - Settlement period must not exceed contract duration ?
    The SAP error message /PM0/ABP_REPVAL_MSG034 indicates that the settlement period you are trying to define exceeds the duration of the contract. This error typically occurs in the context of contract management or project management within SAP, particularly when dealing with settlements related to contracts or projects.
    
    Cause: The error is triggered when: The settlement period you are trying to set (e.g., a billing cycle or a project phase) is longer than the total duration of the contract. There may be a mismatch between the dates defined in the contract and the dates you are trying to use for settlement.
    Solution: To resolve this error, you can take the following steps: Check Contract Duration: Review the contract details to confirm the start and end dates. Ensure that the contract duration is correctly defined and that it encompasses the settlement period you are trying to set. Adjust Settlement Period: Modify the settlement period to ensure it does not exceed the contract duration.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant