Message type: E = Error
Message class: /PM0/ABP_PLAN_EXTDT -
Message number: 028
Message text: Date is outside of contract validity area (&1)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_PLAN_EXTDT028
- Date is outside of contract validity area (&1) ?The SAP error message /PM0/ABP_PLAN_EXTDT028 Date is outside of contract validity area (&1) typically occurs in the context of contract management or project management within SAP. This error indicates that the date you are trying to use for a particular operation (like planning, scheduling, or executing a task) falls outside the validity period of the associated contract.
Cause: Contract Validity Period: The date you are trying to use is either before the start date or after the end date of the contract. Incorrect Date Entry: The date may have been entered incorrectly, leading to it being outside the valid range. Contract Not Active: The contract may not be active or may have been deactivated. System Configuration: There may be configuration settings in the system that restrict the use of certain dates based on contract terms.
Solution: Check Contract Dates: Verify the validity period of the contract associated with the transaction. Ensure that the date you are trying
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABP_PLAN_EXTDT027
Cannot schedule date because it already exists (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PLAN_EXTDT026
Date cannot be scheduled externally (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PLAN_EXTDT029
Date not available (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_PLAN_EXTDT030
Cannot set date because contract is locked (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.