How To Fix /PM0/ABP_PLAN_EXTDT026 - Date cannot be scheduled externally (&1)


/PM0/ABP_PLAN_EXTDT026 - Overview

  • Message type: E = Error

  • Message class: /PM0/ABP_PLAN_EXTDT -

  • Message number: 026

  • Message text: Date cannot be scheduled externally (&1)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PM0/ABP_PLAN_EXTDT026 - Date cannot be scheduled externally (&1) ?
    The SAP error message /PM0/ABP_PLAN_EXTDT026 Date cannot be scheduled externally (&1) typically occurs in the context of planning and scheduling within SAP, particularly in the Advanced Business Planning (ABP) module. This error indicates that the date specified for a planning activity cannot be scheduled externally, which may be due to various reasons.
    Causes:
    
    Invalid Date: The date provided may not be valid for the planning scenario or may fall outside the permissible range.
    
    Configuration Issues: There may be configuration settings in the planning area that restrict external scheduling. Locking Issues: The planning area or the specific date may be locked for external changes due to ongoing processes or settings. Master Data Issues: There may be issues with the master data that prevent the scheduling of the date. Planning Version: The planning version being used may not allow external scheduling for the specified date. Solutions: Check the Date: Verify that the date you are trying to schedule is valid

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author