Message type: E = Error
Message class: /PM0/ABP_BIZPRC -
Message number: 306
Message text: Creation of scheduled claim (&1/&2) for contract &3 not yet taken place
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_BIZPRC306
- Creation of scheduled claim (&1/&2) for contract &3 not yet taken place ?The SAP error message /PM0/ABP_BIZPRC306 indicates that there is an issue with the creation of a scheduled claim for a specific contract. This error typically arises in the context of contract management or billing processes within SAP, particularly in the area of project management or service contracts.
Cause: The error message suggests that the scheduled claim for the specified contract has not yet been created. This can occur due to several reasons, including: Missing Configuration: The system may not be properly configured to allow for the creation of scheduled claims for the specified contract type. Contract Status: The contract may not be in a status that allows for claims to be created. For example, it might be in a draft or inactive state. Timing Issues: The scheduled claim may be set to be created at a future date, and the current date is before that scheduled date. Data Inconsistencies: There may be missing or incorrect data
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABP_BIZPRC305
Open claim &2 exists for contract &1 on &3 (processor: &4)
What causes this issue? The contract data is incorrect due to the open claim where benefit recognition has not been performed after the validity date...
/PM0/ABP_BIZPRC303
Enter a value between 1 and 5 for the number of contract elements
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_BIZPRC307
Creation of scheduled claim (&1/&2) for contract &3 not yet sent
What causes this issue? A scheduled claim with the event type &V1& and the cause of loss &V2& exists for the contract &V3&. T...
/PM0/ABP_BIZPRC308
Error in CM interface; surrender value cannot be checked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.