Message type: E = Error
Message class: /PM0/ABB_MESSAGES -
Message number: 424
Message text: The TCN transfer date must be later than or the same as the TCN end date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABB_MESSAGES424
- The TCN transfer date must be later than or the same as the TCN end date ?The SAP error message /PM0/ABB_MESSAGES424 indicates that there is an issue with the TCN (Transfer Control Number) transfer date in relation to the TCN end date. Specifically, the error states that the transfer date must be later than or the same as the TCN end date. This typically occurs in scenarios involving data transfers, project management, or logistics where date validations are enforced.
Cause: Date Configuration Error: The transfer date you are trying to enter is earlier than the end date of the TCN. This violates the logical sequence of dates. Data Entry Mistake: There may have been a typographical error when entering the dates, leading to an incorrect sequence. System Configuration: The system may have specific configurations or validations that enforce this rule, and the data being processed does not comply.
Solution: Check Dates: Review the TCN transfer date and the TCN end date. Ensure that the transfer date is either the same as or
Get instant SAP help. Sign up for our Free Essentials Plan.
/PM0/ABB_MESSAGES423
The transfer date can only be created for a complete TCN
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABB_MESSAGES422
The clause end date must be earlier/the same as the level end date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABB_MESSAGES425
The TCN end date field is a required field
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABB_MESSAGES426
The TCN end time field is a required field
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.