How To Fix /PLMI/RTG_RCA_SCO079 - Status of planning scope &1 set to "Synchronized"


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PLMI/RTG_RCA_SCO -

  • Message number: 079

  • Message text: Status of planning scope &1 set to "Synchronized"

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PLMI/RTG_RCA_SCO079 - Status of planning scope &1 set to "Synchronized" ?

    The SAP error message /PLMI/RTG_RCA_SCO079 indicates that the status of a planning scope has been set to "Synchronized." This typically occurs in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) when there are issues related to the synchronization of planning data.

    Cause:

    1. Data Synchronization Issues: The planning scope may not be properly synchronized with the underlying data sources or systems. This can happen due to changes in the data model, configuration issues, or problems with data extraction.
    2. Configuration Errors: Incorrect configuration settings in the planning scope or related planning areas can lead to this status.
    3. Process Interruptions: If there were interruptions during the data load or synchronization processes, it could result in the planning scope being marked as synchronized without the expected data being available.
    4. Versioning Issues: If there are multiple versions of the planning scope, conflicts may arise that lead to this status.

    Solution:

    1. Check Synchronization Status: Review the synchronization logs and status in the SAP IBP or APO system to identify any errors or warnings that may have occurred during the synchronization process.
    2. Re-Synchronize the Planning Scope: If the planning scope is not synchronized correctly, you may need to trigger a re-synchronization. This can often be done through the planning area or scope management interface.
    3. Review Configuration Settings: Ensure that the configuration settings for the planning scope are correct. This includes checking the data sources, planning areas, and any relevant parameters.
    4. Data Validation: Validate the data being used in the planning scope to ensure that it is complete and accurate. This may involve checking the data extraction processes and ensuring that all necessary data is available.
    5. Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or known issues.
    6. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.
    • Training and Documentation: Review training materials or documentation related to SAP IBP or APO to better understand the planning scope and synchronization processes.

    By following these steps, you should be able to diagnose and resolve the issue related to the /PLMI/RTG_RCA_SCO079 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author