Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/PPE_BO -
Message number: 051
Message text: Node &1 &2 &3 and its subordinates copied
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/PPE_BO051
- Node &1 &2 &3 and its subordinates copied ?The SAP error message
/PLMI/PPE_BO051 Node &1 &2 &3 and its subordinates copied
typically occurs in the context of SAP's Product Lifecycle Management (PLM) or similar modules where there is an issue with copying or transferring data related to nodes in a structure, such as a bill of materials (BOM) or a project structure.Cause:
- Data Integrity Issues: The error may arise if there are inconsistencies or issues with the data being copied, such as missing or invalid entries in the source node or its subordinates.
- Configuration Problems: There may be configuration issues in the system that prevent the proper copying of nodes and their relationships.
- Authorization Issues: The user may not have the necessary authorizations to perform the copy operation.
- Technical Errors: There could be underlying technical issues, such as database locks or system performance problems.
Solution:
- Check Data Integrity: Verify that the source node and its subordinates are correctly defined and do not have any missing or invalid data. Ensure that all required fields are filled out.
- Review Configuration: Check the configuration settings related to the copying process in the relevant module. Ensure that all necessary settings are correctly configured.
- User Authorizations: Ensure that the user performing the operation has the necessary authorizations to copy the nodes and their subordinates.
- System Logs: Check the system logs (transaction SLG1) for any additional error messages or warnings that could provide more context about the issue.
- Technical Support: If the issue persists, consider reaching out to your SAP support team or consulting the SAP Notes for any known issues or patches related to this error message.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/PPE_BO050
Error when modifying name
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/PPE_BO049
Node &1 &2 &3 copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/PPE_BO052
Relationship does not exist with counter &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/PPE_BO053
You cannot create headers without material since phantom assemblies exist
What causes this issue? You want to create a header without a material for variant &v1&. However, at least one change state of this variant h...
Click on this link to search all SAP messages.