Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/MBOM_MAP_29 -
Message number: 061
Message text: Check effectivity data
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/MBOM_MAP_29061
- Check effectivity data ?The SAP error message
/PLMI/MBOM_MAP_29061 Check effectivity data
typically occurs in the context of managing Manufacturing Bill of Materials (MBOM) and is related to the effectivity dates or status of the components in the BOM. This error indicates that there is an issue with the effectivity data for the BOM or its components, which can prevent the system from processing the BOM correctly.Causes:
- Missing Effectivity Data: The BOM or its components may not have the required effectivity data (validity dates) defined.
- Incorrect Effectivity Dates: The effectivity dates may be set incorrectly, leading to conflicts or overlaps.
- Inactive BOM: The BOM may be inactive or not valid for the current production period.
- Configuration Issues: There may be configuration issues in the system that affect how effectivity data is handled.
- Data Consistency Issues: There may be inconsistencies in the data related to the BOM or its components.
Solutions:
- Check Effectivity Data: Review the effectivity data for the BOM and its components. Ensure that the validity dates are correctly set and that there are no overlaps or gaps.
- Activate BOM: If the BOM is inactive, activate it to ensure it can be used in production.
- Update BOM: If there are missing or incorrect effectivity dates, update the BOM and its components with the correct information.
- Review Configuration: Check the configuration settings related to effectivity in the SAP system to ensure they are set up correctly.
- Data Consistency Check: Run data consistency checks to identify and resolve any inconsistencies in the BOM data.
Related Information:
CS02
(Change BOM) or CS03
(Display BOM) to review and modify BOM data.By following these steps, you should be able to identify and resolve the issue related to the /PLMI/MBOM_MAP_29061 Check effectivity data
error message.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/MBOM_MAP_29050
Date & and change no. & determined from revision level &
What causes this issue? You are processing a BOM with reference to revision level &V3&.System Response The system determines change number &...
/PLMI/MBOM_MAP_29049
A change number was entered, so the revision level is ignored
What causes this issue? You want to change or display a BOM and have entered both a change number and a revision level. The revision level is an addi...
/PLMI/MBOM_MAP_29112
Material is a required entry for item category &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/MBOM_MAP_29116
Material type & not supported for BOM usage &
What causes this issue? You want to create a BOM. The BOM usage that you have entered does <ZH>not</> support BOMs for a material with th...
Click on this link to search all SAP messages.