How To Fix /PLMI/MBOM_MAP_29049 - A change number was entered, so the revision level is ignored


/PLMI/MBOM_MAP_29049 - Overview

  • Message type: E = Error

  • Message class: /PLMI/MBOM_MAP_29 -

  • Message number: 049

  • Message text: A change number was entered, so the revision level is ignored

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/PLMI/MBOM_MAP_29049 - Details

  • The SAP error message /PLMI/MBOM_MAP_29049 indicates that a change number was entered in the system, which leads to the revision level being ignored. This typically occurs in the context of managing Bill of Materials (BOM) and related engineering change management processes.
    
    Cause: Change Number Entry: The error is triggered when a user attempts to access or modify a BOM or related object while a change number is specified. In SAP, a change number is used to track changes to objects, and when it is present, the system prioritizes the change number over the revision level. Revision Level Ignored: The system is designed to ignore the revision level when a change number is specified, as the change number indicates that there is a specific change process in place that may not align with the current revision level.
    Solution: Review Change Number: Check if the change number entered is correct and relevant to the BOM or object

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/PLMI/MBOM_MAP_29049 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author