Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/GSS_I2B -
Message number: 078
Message text: Required quantity calculation with product assembly might not be correct
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/GSS_I2B078
- Required quantity calculation with product assembly might not be correct ?The SAP error message
/PLMI/GSS_I2B078 Required quantity calculation with product assembly might not be correct
typically arises in the context of product assembly and planning processes within SAP. This error indicates that there may be an issue with how the required quantities for components in a product assembly are being calculated. Here are some potential causes, solutions, and related information:Causes:
- Incorrect Master Data: The master data for the materials involved in the assembly might be incorrect or incomplete. This includes BOM (Bill of Materials), routing, or material master data.
- Configuration Issues: There may be configuration issues in the system that affect how the required quantities are calculated.
- Planning Parameters: The planning parameters set in the system may not align with the actual production processes or requirements.
- Assembly Process Changes: Changes in the assembly process that have not been reflected in the system can lead to discrepancies in required quantities.
- Batch Management: If batch management is enabled, issues with batch determination can also lead to incorrect quantity calculations.
Solutions:
- Check Master Data: Review the BOM and routing for the product assembly to ensure that all components are correctly defined and that the quantities are accurate.
- Review Configuration: Check the configuration settings related to product assembly and planning to ensure they are set up correctly.
- Adjust Planning Parameters: If necessary, adjust the planning parameters to better reflect the actual production needs.
- Update Assembly Processes: If there have been changes to the assembly process, ensure that these changes are reflected in the system.
- Run Consistency Checks: Use SAP tools to run consistency checks on the master data and planning settings to identify any discrepancies.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/GSS_I2B077
Required quantity calculation for target cannot be performed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_I2B076
Required quantity differs between source and target; check the mapping
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_I2B079
Target changes might have resulted quantity difference;run quantity check
What causes this issue? You have made changes to target BOM items that may have resulted in a quantity difference between the source and target struc...
/PLMI/GSS_I2B080
Object Dependencies checkbox has been cleared for synchronization unit &1
What causes this issue? A synchronization unit (SU) has been created for a material variant.System Response If the SU is for a material variant, the...
Click on this link to search all SAP messages.