Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/GSS_I2B -
Message number: 077
Message text: Required quantity calculation for target cannot be performed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/GSS_I2B077
- Required quantity calculation for target cannot be performed ?The SAP error message
/PLMI/GSS_I2B077 Required quantity calculation for target cannot be performed
typically occurs in the context of SAP's Integrated Business Planning (IBP) or Advanced Planning and Optimization (APO) modules. This error indicates that the system is unable to calculate the required quantity for a target due to various reasons. Here are some common causes, potential solutions, and related information:Causes:
- Missing Master Data: The required master data (like materials, locations, or resources) may not be set up correctly or may be missing.
- Incorrect Configuration: The planning area or planning book may not be configured properly, leading to issues in calculations.
- Data Inconsistencies: There may be inconsistencies in the data, such as incorrect or missing key figures.
- Planning Version Issues: The planning version being used may not be active or may not have the necessary data.
- Time Period Issues: The time period for which the calculation is being attempted may not be valid or may not have data.
- Authorization Issues: The user may not have the necessary authorizations to access the required data.
Solutions:
- Check Master Data: Ensure that all necessary master data is correctly set up and available in the system. This includes checking for the existence of materials, locations, and any other relevant entities.
- Review Configuration: Verify the configuration of the planning area and planning book. Ensure that all necessary settings are correctly defined.
- Data Validation: Check for any inconsistencies in the data. This may involve reviewing key figures and ensuring that they are populated correctly.
- Active Planning Version: Make sure that the planning version you are using is active and contains the necessary data for the calculation.
- Time Period Validation: Confirm that the time period for which you are trying to perform the calculation is valid and has the required data.
- Authorization Check: Ensure that the user has the necessary authorizations to access the data required for the calculation.
Related Information:
/SAPAPO/SDP94
for demand planning or /SAPAPO/MC90
for configuration checks.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and troubleshooting.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/GSS_I2B076
Required quantity differs between source and target; check the mapping
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_I2B075
Conversion from &1 to &2 is not possible for material &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_I2B078
Required quantity calculation with product assembly might not be correct
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/GSS_I2B079
Target changes might have resulted quantity difference;run quantity check
What causes this issue? You have made changes to target BOM items that may have resulted in a quantity difference between the source and target struc...
Click on this link to search all SAP messages.