Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/ECN_BO_CC -
Message number: 095
Message text: No revision level exists for material &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/ECN_BO_CC095
- No revision level exists for material & ?The SAP error message
/PLMI/ECN_BO_CC095 No revision level exists for material &
typically occurs in the context of Engineering Change Management (ECM) or Product Lifecycle Management (PLM) when you are trying to access or process a material that does not have a defined revision level. This can happen in various scenarios, such as when creating or modifying engineering change notices (ECNs) or when trying to view the details of a material that is expected to have a revision history.Cause:
- Missing Revision Level: The primary cause of this error is that the material in question does not have a revision level assigned to it. This can happen if the material was created without a revision or if the revision levels were not properly maintained.
- Incorrect Material Type: The material type may not support revision levels, or the configuration for the material type may not be set up to handle revisions.
- Data Inconsistency: There may be inconsistencies in the data, such as missing entries in the relevant tables that manage revision levels.
Solution:
Check Material Master Data:
- Go to the material master record (transaction code
MM03
) and check if the revision level is defined for the material. If it is missing, you may need to create or update the material to include a revision level.Create a Revision Level:
- If the material does not have a revision level, you can create one by using transaction code
MM02
to modify the material and add the necessary revision information.Review Configuration:
- Ensure that the material type is configured to support revision levels. This can be checked in the configuration settings (transaction code
SPRO
) under the relevant sections for material management and engineering change management.Check Change Management Settings:
- Review the settings for Engineering Change Management to ensure that they are correctly configured to handle revisions and that the necessary authorizations are in place.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on managing revision levels and handling errors related to material master data.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, especially if this is a recurring issue or if it affects multiple materials.
Related Information:
MM03
- Display MaterialMM02
- Change MaterialSPRO
- Customizing Implementation GuideMARA
(General Material Data), MARC
(Plant Data for Material), and MVER
(Material Consumption).By following these steps, you should be able to resolve the error and ensure that the material has the necessary revision levels defined.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/ECN_BO_CC094
Revision level cannot be created for material &
What causes this issue? You want to define the change status of material &V1& further by using a revision level. This can only be done if an ...
/PLMI/ECN_BO_CC093
Change number & not allowed for material
What causes this issue? You want to assign a revision level to a material, using change number &V1&. Change number &V1& is not active...
/PLMI/ECN_BO_CC097
Revision level & does not exist for material &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/ECN_BO_CC105
Status & is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.