Do you have any question about this error?
Message type: E = Error
Message class: /PLMI/ECN_BO_CC -
Message number: 093
Message text: Change number & not allowed for material
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PLMI/ECN_BO_CC093
- Change number & not allowed for material ?The SAP error message
/PLMI/ECN_BO_CC093 Change number & not allowed for material
typically occurs in the context of Engineering Change Management (ECM) when trying to assign a change number to a material that is not eligible for that change. This can happen for several reasons, and understanding the cause is essential for finding a solution.Causes:
Material Status: The material may have a status that does not allow changes. For example, if the material is blocked or marked for deletion, it may not be eligible for a change number.
Change Number Validity: The change number you are trying to use may not be valid for the specific material or may not be in the correct status (e.g., it might be inactive or not yet released).
Change Control Settings: The configuration settings for change control in the system may restrict certain materials from being assigned change numbers.
Material Type Restrictions: Certain material types may have restrictions on change management processes, preventing the assignment of change numbers.
User Authorizations: The user may not have the necessary authorizations to assign change numbers to the material.
Solutions:
Check Material Status: Verify the status of the material in question. If it is blocked or has a status that prevents changes, you may need to change its status or use a different material.
Validate Change Number: Ensure that the change number you are trying to assign is valid and active. You can check this in the change management transaction (e.g., using transaction code
CC01
orCC02
).Review Change Control Settings: Consult with your SAP configuration team to review the settings related to change control for the material type in question. Adjustments may be needed to allow the assignment of change numbers.
Check Material Type: If the material type has restrictions, consider whether a different material type can be used or if the current type can be modified to allow change number assignments.
User Authorizations: Ensure that the user attempting to assign the change number has the necessary authorizations. This may involve checking roles and permissions in the SAP system.
Consult Documentation: Review SAP documentation or help resources related to Engineering Change Management for additional insights and best practices.
Related Information:
CC01
(Create Change Number), CC02
(Change Change Number), and CC03
(Display Change Number).By following these steps, you should be able to identify the cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/PLMI/ECN_BO_CC076
Status & does not support date shift
What causes this issue? You want to make a date shift on a change master record. This is not supported for status &V1&.System Response The s...
/PLMI/ECN_BO_CC075
Alternative date & already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PLMI/ECN_BO_CC094
Revision level cannot be created for material &
What causes this issue? You want to define the change status of material &V1& further by using a revision level. This can only be done if an ...
/PLMI/ECN_BO_CC095
No revision level exists for material &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.